On May 28, the Weatherford Municipal Utility Board met to approve plans for Lake Weatherford, and the room was packed. In the week before, social media posts, a petition and some controversy had built up around one question: what would happen to Tavern on the Lake? According to The Community News, the meeting ran long, with a long line of supporters at the podium and an extended executive session before the vote.
The board's decision is the reason the lake looks the way it does this fall. The waterfront is being divided. The city takes the beach and rebuilds it as a free public amenity. The Plylers keep the restaurant, the boat slips and the shop. The city is targeting Spring Break 2027 to finish the beach, and the construction calendar this winter reflects that compromise.
What the Utility Board Actually Split
Randy Plyler owns Tavern on the Lake at the Weatherford Marina. Before May, his lease with the city covered the restaurant, the beach, the boat slips and the Crappie House. The city's first improvement plan would have left him with only the restaurant. He told the board that change would cut 52 percent of his revenue.
"We are not opposed to working with the city, and asking questions should not be mistaken as being unwilling to cooperate," Plyler said at the meeting, as The Community News reported. The Weatherford Democrat put the online petition at 3,700 signatures and counted 50-some people who came to speak for the couple in person.
The board voted unanimously to amend the lease and take the beach and recreation area out of it. Under the amendment, the lakefront now divides this way:
- City of Weatherford: the beach and recreation area, slated for a rebuild
- The Plylers: Tavern on the Lake, the boat slips and the mechanic shop
- City renovation list: the Crappie House, dock access and gangway, and the boat storage area
One detail from the early coverage was later corrected. The Community News first reported that Plyler had been given a 90-day notice to end his lease. The city clarified that no termination notice was ever issued. The lease already contained a mutual 90-day termination-for-convenience clause, which either party could use.
The Price Tag and the Calendar
At the May meeting, Jaycob Kirkpatrick, the city's Director of Parks, Recreation and Special Events, put the full improvement package at $1.8 million. The beach is the largest piece. On September 24, the Utility Board took up a staff agenda report recommending a construction contract with Patcon Services, LLC, capped at $1,367,871, through The Interlocal Purchasing System cooperative. In late October, the Weatherford Ledger reported that the city's quarterly parks report confirms the contract has been executed, with completion estimated for spring 2027.
Here is how the scheduled dates line up across the city documents:
| Milestone | Scheduled date | Source |
|---|---|---|
| Beach construction start | September 30, 2026 | Utility Board agenda report |
| Crappie House, boat storage, general maintenance | Winter 2026 | Staff estimate reported in May |
| Beach substantial completion | February 17, 2027 | Utility Board agenda report |
| Beach final completion | March 9, 2027 | Utility Board agenda report |
| Beach completion target | Spring Break 2027 | City release, May 28 |
| Lake Trail Phase 1 | Spring 2027 | City release, May 28 |
| Lake Trail Phase 2 | Summer 2029 | City release, May 28 |
These are contract and planning targets. The contract allows 140 days to substantial completion and 160 days to final completion. That leaves a short window between the March 9 finish and Spring Break. Weather and field conditions decide whether a schedule like this holds. The city has not yet posted the actual opening date.
Crews have already been clearing the lake's slopes. The quarterly report says the city brought in "goat scaping" to clear vegetation from the Lake Weatherford hillsides and the Heritage Park canal. Crews also mowed and cleaned up along the Lake Weatherford Boardwalk.
What "Free" Will Cover, and What Will Still Cost Money
The main change for residents is how they will get onto the sand. Free public access to the beach is "a key component of the project," according to the agenda report. The finished beach area is planned to include:
- New beach sand behind a block seawall, which the contract describes as a large retaining wall
- A new restroom building
- Two large pavilions and three smaller pavilions, which the city's May release calls palapas
- Two regulation sand volleyball courts
- Expanded parking and lighted walkways
The city's May 28 announcement says the public beach and restrooms will have no charge. The pavilions, palapas and volleyball courts will be first-come, first-served unless someone has reserved them. The September agenda report says pavilion rentals for birthday parties, family gatherings and other events will cost an additional fee. The Democrat's May coverage lists the boat ramp and the renovated Crappie House among the amenities planned for free public access. Boat slip fees in the storage area stay in place.
All of this describes the finished project. Today, Texas Parks and Wildlife's Lake Weatherford access page still lists a launch fee at the privately operated Weatherford Marina. Until the city announces the beach, ramp and Crappie House are open on the new terms, plan your visits under the current rules.
The Tavern Keeps the Lake Open This Winter
Because Tavern on the Lake stayed under its current operators, the lake still has a place to eat and drink during the beach project. Experience Weatherford lists it at 210 W. Lake Dr., phone 817-550-6408. The listing describes a year-round restaurant serving local craft beer, a full bar, burgers, catfish and other American food. Its regular lineup includes Wednesday bingo, Thursday live music and Sunday Dallas Cowboys watch parties. Call ahead for current hours, since the directory listing doesn't give them.
The tavern was already a gathering spot before this fall. On June 5, it hosted the free, all-ages Parker County Beach Party featuring Love Canon, with James Hinkle and Biscuit Miller opening. Next summer's events will likely be shaped by the new layout, with a public beach and pavilions next to a restaurant that has a stage and a following.
The Plylers had their own plans for the marina before the lease changed. At the May meeting, according to the Weatherford Democrat, Plyler described a proposal he had prepared with financing in mind. It included cabanas, repainting, Crappie House repairs, a replacement fuel tank and turning the old mechanic shop into a bait shop. The mechanic shop stayed with the Plylers under the amended lease. A bait shop has not been announced.
The Trail Ties the Two Sides Together
The beach and the marina will sit side by side, and the city's Lake Trail Project is meant to connect them. The May 28 release says the trail will link the lake neighborhoods, the marina area, the beach and the parking areas. Phase 1 is a 10-foot-wide hike-and-bike trail targeted for spring 2027, around the same time the beach work is targeted for completion. Phase 2 extends the trail across the dam to East Lake Drive, with completion planned for summer 2029.
"Whether families are spending the day by the water or residents are walking and biking the future trail, we want this to be a place people can experience and take pride in," Kirkpatrick said in the city's announcement. The release says the beach and trail come from Weatherford's General Plan and Parks Master Plan, so this project is part of a longer-range parks plan.
The same quarterly report lists another project for Weatherford families with young kids. The city approved Whirlix Design, Inc. to build a playground at Holland Lake, with completion estimated for summer 2027.
Projects like the Lake Weatherford beach change how a neighborhood works day to day, and they shape what nearby homes are worth to the next owner. If you're thinking about property near the lake, or wondering how the new beach and trail could affect a home you already own, Edge Real Estate can walk you through it with the local detail it deserves. Let's Connect.